SCC
Scheduling Conditions
Specifies scheduling conditions in DELFOR messages (e.g. firm/forecast commitment level).
Element Structure
| Position | Element Name (EN) | Type | Mandatory |
|---|---|---|---|
| 4017 | Delivery plan commitment level code | an..3 | M |
| 4493 | Delivery instruction code | an..3 | C |
| C329 | Pattern description | C | C |
Example
SCC segment example
SCC+1'
Used in these messages